Barco FLM R22+ Guia do Utilizador Página 34

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
Vista de página 33
3. Physical installation
Image 3-31
6. Lift up the projector and hook the four rigging clamps over the support bars of the truss.
7. Lock all four rigging clamps.
8. Install a safety chain (S) around both sides of the carrying handle and around the truss.
S
S
Image 3-32
9. Lift up the truss with attached projector to the desired height.
Proceed with the alignment procedure, see "Alignment of a ceiling mount FLM projector", page 27.
30 R59770179 FLM R22+ 15/03/2010
Vista de página 33
1 2 ... 29 30 31 32 33 34 35 36 37 38 39 ... 242 243

Comentários a estes Manuais

Sem comentários