17. Removal of the projector covers
17.8 Installation of the input cover
Necessary tools
7mmat screw driver.
How to install the input cover of the projector ?
1. Install the input cover of the projector doing the following:
a) Bring the input cover towards its nal position (A),
b) then gently push the locking stud at the right top corner (B) into its receiver,
c) then gently push the locking stud at the right bottom corner (C) into its receiver.
Image 17-16
2. Secure the input cover by locking the two captive screws at the left side of the input cover.
R59770179 FLM R22+ 15/03/2010